This course covers forecasting, working with resource pools and assignments, predicting duration and work calculations, and optimizing resource utilization.
Objectives:
Forecast time-phased generic skill or role requirements
Create, modify, and use resource pools
Add, change, substitute, or remove resource assignments
Predict durations and work calculations
Optimize resource utilization
Topics:
Technical Requirements:
P500+ Processor, 128MB of RAM; Windows 2000, 2003, XP, Minimum screen resolution 800x600, Internet Explorer 6.0 or higher; Windows Media Player 9.0 or higher; Adobe Flash Player 8.0 or higher; 56K minimum connection; broadband (256 kpbs or higher) connection recommended; Cookies enabled; Sound card with speakers or headphones strongly recommended.